| CPC E21B 34/12 (2013.01) [E21B 17/02 (2013.01)] | 19 Claims |

|
8. A method comprising:
designing an uphole section of a production tubing string based on a combination of hydrate and erosion tendencies within a well in which the production tubing string is to be installed, the uphole section having a first diameter;
designing a midhole section of the production tubing string based on optimal production rate and installation requires of the well;
designing a downhole section of the production tubing string based on mechanical strength of the well;
fabricating the production string having the designed uphole section, the designed midhole section and the designed downhole section;
producing gas through the production tubing string, the production tubing string comprising:
the uphole section having the first diameter;
the midhole section having a second diameter that is larger than the first diameter; and
the downhole section having a third diameter that is smaller than the second diameter.
|