US 12,298,466 B1
Monitoring method for spring protection, device, medium and electronic equipment
Yunfeng Zhang, Shandong (CN); Zhiqiang Zhao, Shandong (CN); Guantao Ding, Shandong (CN); Wen Liu, Shandong (CN); Qianqian Lu, Shandong (CN); and Minghui Lyu, Shandong (CN)
Assigned to Shandong Provincial Geo-mineral Engineering Exploration Institute (801 Hydrogeological Engineering Geological Brigade of Shandong Geology and Mineral Exploration and Development Bureau), Shandong (CN)
Filed by Shandong Provincial Geo-mineral Engineering Exploration Institute (801 Hydrogeological Engineering Geological Brigade of Shandong Geology and Mineral Exploration and Development Bureau), Shandong (CN)
Filed on Oct. 18, 2024, as Appl. No. 18/919,507.
Int. Cl. G01V 9/02 (2006.01)
CPC G01V 9/02 (2013.01) 7 Claims
OG exemplary drawing
 
1. A monitoring device for spring protection by tracing a construction project generating a risk of spring drying, comprising a processor and integrated with a computer program that, when executed by the processor, causes the processor to perform operations comprising:
obtaining an actual flow rate of a spring eye of a spring pool to be monitored at a current time;
based on the actual flow rate of the spring eye, determining whether a flow rate of the spring eye of the spring pool is interfered with by urban construction projects, and when so, determining a descending rate of the flow rate of the spring eye of the spring pool under an interference of the urban construction projects;
determining a corresponding target duration range according to the descending rate, and determining a corresponding interference node of an urban construction project of the urban construction projects in each groundwater recharge path of the spring pool, wherein the corresponding target duration range is a duration range required for the urban construction project to generate interference on the flow rate of the spring eye of the spring pool; and
determining a target flow duration of groundwater from each interference node to the spring pool, and when the target flow duration is within the corresponding target duration range, determining the urban construction project corresponding to the corresponding interference node as a preferentially censored project, to reduce the risk of the spring drying up of the spring pool.