CPC B61L 27/20 (2022.01) [B61L 27/16 (2022.01); B61L 27/60 (2022.01)] | 10 Claims |
1. A method for generating a train route for railway signaling based on moving block principle, the method comprising:
generating a directed graph for a track layout by calling pre-stored track information;
generating a path matrix corresponding to a number of movement hops of a train based on the directed graph, and generating the train route from the path matrix; and
verifying the train route by obtaining route information of the train from a mission of an automatic train supervision (ATS) system and comparing the route information with the train route,
wherein the directed graph comprises:
nodes defined by at least one point machine (PM) and classes located on the track layout; and
edges defined by tracks located between adjacent nodes among the nodes, and
wherein the generating of the directed graph further comprises:
generating a node matrix for the nodes by traversing the directed graph in a zigzag direction;
generating an initial routing matrix by multiplying the node matrix by an identity matrix; and
generating a reachability matrix based on whether any of the nodes are interconnected and whether the classes are in ascending order.
|