CPC H04W 52/365 (2013.01) [H04B 7/0426 (2013.01); H04B 7/0617 (2013.01); H04B 7/0626 (2013.01); H04B 7/0695 (2013.01); H04B 7/088 (2013.01); H04L 5/0023 (2013.01); H04L 5/0048 (2013.01); H04L 5/0051 (2013.01); H04W 16/28 (2013.01); H04W 52/08 (2013.01); H04W 52/10 (2013.01); H04W 52/146 (2013.01); H04W 52/242 (2013.01); H04W 52/248 (2013.01); H04W 52/325 (2013.01); H04W 52/362 (2013.01); H04W 52/367 (2013.01); H04W 72/046 (2013.01); H04W 72/0473 (2013.01); H04W 72/12 (2013.01); H04W 72/121 (2013.01); H04W 72/1268 (2013.01); H04W 72/23 (2023.01)] | 20 Claims |
1. A base station, comprising:
at least one memory; and
at least one processor coupled with the at least one memory and configured to cause the base station to:
transmit downlink control information (DCI) comprising a transmission configuration indication (TCI), wherein the TCI includes an indication of a first reference signal resource; and
receive a first uplink transmission based on a first transmit power associated with a pathloss based on the first reference signal resource.
|