CPC H02M 3/33584 (2013.01) [H02M 1/0009 (2021.05); H02M 1/0058 (2021.05); H02M 3/33573 (2021.05)] | 15 Claims |
1. A method for controlling a reverse current of a phase-shifted full-bridge circuit, comprising:
determining an error value of a reverse input current of the phase-shifted full-bridge circuit based on a sampling value of the reverse input current and a reference value of the reverse input current;
determining a compensation control quantity of a switch drive signal of the phase-shifted full-bridge circuit based on the error value, wherein the compensation control quantity is a compensation quantity of the error value and corresponds to a period or a duty cycle of the switch drive signal;
determining a period control quantity and a duty cycle control quantity of the switch drive signal based on the compensation control quantity, wherein the period control quantity is within a value range of the period of the switch drive signal, and the duty cycle control quantity is within a value range of the duty cycle of the switch drive signal; and
controlling the switch drive signal based on the period control quantity and the duty cycle control quantity.
|