CPC H02M 1/14 (2013.01) [B60L 53/20 (2019.02); H02J 7/02 (2013.01); H02M 1/4266 (2013.01); H02M 7/219 (2013.01); B60L 2210/10 (2013.01); B60L 2210/30 (2013.01); H02J 2207/20 (2020.01)] | 20 Claims |
1. A system comprising:
an alternating current (AC) to direct current (DC) converter (AC-DC converter), the AC-DC converter including a bulk capacitor;
a DC-DC converter connectable to the AC-DC converter; and
one or more controllers configured to control the system by performing operations, the operations including:
determining a current demand of a load, the load being connectable to the DC-DC converter, for a charging cycle of the load;
performing a first comparison of the current demand to one or more current demand thresholds; and
generating a voltage setpoint for the bulk capacitor based on the first comparison, wherein the generation of the voltage setpoint limits output current ripple of the DC-DC converter for the charging cycle.
|