CPC G05B 19/042 (2013.01) [H02J 13/00001 (2020.01); H02J 13/00002 (2020.01); G05B 2219/2639 (2013.01); H02J 3/381 (2013.01)] | 21 Claims |
1. A method, comprising:
providing, by processing circuitry, a net consumption trajectory comprising net consumption targets for one or more subperiods of a time period, wherein each net consumption target indicates a target difference from a beginning of a time period to an end of the subperiod between total consumption and total production or offset;
generating, by the processing circuitry and for a subperiod of the plurality of subperiods, a set of curtailment actions predicted to achieve the net consumption target for the subperiod; and
implementing, by the processing circuitry, the set of curtailment actions.
|