CPC F01K 3/02 (2013.01) [B63H 11/00 (2013.01); F01K 3/08 (2013.01); F01K 3/186 (2013.01); F01K 13/02 (2013.01); F01K 15/00 (2013.01); F03G 6/071 (2021.08); F22B 29/06 (2013.01); F22B 35/10 (2013.01); F28D 20/00 (2013.01); H01M 8/04014 (2013.01); H01M 8/04029 (2013.01); H01M 8/04037 (2013.01); H01M 8/04052 (2013.01); H01M 8/04074 (2013.01); H02J 1/102 (2013.01); H02J 3/00 (2013.01); H02J 3/04 (2013.01); H02M 1/0003 (2021.05); H02M 1/007 (2021.05); B63H 1/12 (2013.01); B63H 11/12 (2013.01); B63H 11/14 (2013.01); B63H 11/16 (2013.01); F01K 11/02 (2013.01); F01K 19/04 (2013.01); F03D 9/18 (2016.05); F28D 2020/0004 (2013.01); Y02E 60/14 (2013.01)] | 53 Claims |
1. A material processing system, including:
a thermal energy storage (TES) unit configured to store thermal energy generated from an electric heater, wherein the TES unit is configured to heat a process gas using stored thermal energy; and
a material processing reactor configured to receive the heated process gas and perform a process on the material in the reactor;
wherein the TES unit is configured to output stored thermal energy at a rate that maintains a selected process condition in the reactor,
wherein the TES unit includes a thermal storage medium and a fluid movement system that are configured to direct a working gas through the thermal storage medium to heat the working gas, and
wherein the fluid movement system is configured to direct the heated working gas to a heat exchanger configured to transfer heat from the heated working gas to the process gas.
|