CPC G06Q 50/28 (2013.01) [B63H 25/02 (2013.01); B66C 13/48 (2013.01); G05D 1/0088 (2013.01); G06Q 10/1097 (2013.01); B63H 2025/028 (2013.01)] | 20 Claims |
1. A scheduling center system, comprising:
at least one memory that stores at least one machine executable instruction that when executed by at least one processor configures the at least one processor to:
determine a ship loading plan based on ship information and container information;
generate a ship berthing task, a ship loading task, and a container distribution task based on the ship loading plan,
wherein the ship berthing task is generated to include identification information of the target shore crane apparatus and an operation area of the target shore crane apparatus towards which a target ship is expected to move; and
transmit the ship berthing task, the ship loading task, and the container distribution task to the target ship, a target shore crane apparatus, and a warehouse management system of a warehouse center, respectively.
|