| CPC H02S 50/10 (2014.12) [G01R 19/16528 (2013.01); G01R 19/16538 (2013.01); G06F 11/327 (2013.01); H02S 50/00 (2013.01); Y02E 10/50 (2013.01); Y04S 10/52 (2013.01)] | 20 Claims |

|
1. A method comprising:
receiving, by one or more processors and from at least one power device of a power generation system, a fault identification associated with the at least one power device of the power generation system, wherein the fault identification comprises a fault type and a temporal value;
retrieving, by the one or more processors and from storage memory, a rule associated with the fault identification, the rule comprising a fault type term and a temporal term, wherein the fault type term corresponds to the fault type, and wherein the temporal term corresponds to the temporal value;
determining, by the one or more processors and based on the rule and the fault identification, a severity level associated with the fault identification; and
activating an alert on a user interface connected to the one or more processors, wherein the alert corresponds to the severity level.
|