| CPC G05B 15/02 (2013.01) | 27 Claims |

|
1. A method comprising:
training, by one or more processors, a generative AI model using first operating data from building equipment and natural language of a plurality of first service reports indicating a plurality of first problems associated with the building equipment, the generative AI model comprising a transformer-based neural network;
predicting, by the one or more processors using the trained generative AI model, that a control strategy that controls the building equipment is likely to cause one or more future problems to occur with the building equipment based on second operating data from the building equipment; and
automatically initiating, by the one or more processors, one or more actions to prevent the one or more future problems from occurring or mitigate an effect of the one or more future problems, the one or more actions comprising adjusting the control strategy.
|