| CPC G01V 1/50 (2013.01) [G01V 1/46 (2013.01); G06N 5/022 (2013.01); G06N 5/025 (2013.01)] | 20 Claims |

|
1. A method comprising:
based on indication of a control point during propagation of a wellbore trajectory, via a bottom hole assembly through a formation:
generating, via a particle generator, a plurality of interpretations of the control point based, at least in part, on wellbore measurements corresponding to the control point;
for each interpretation of the plurality of interpretations, generating, via a pseudo log generator, a pseudo log based, at least in part, on the interpretation and historical well data;
determining posterior probabilities for the plurality of interpretations based, at least in part, on evaluation of pseudo logs against historical formation property measurements and a set of one or more rules based on knowledge of the formation;
updating a geological model to indicate the control point and with at least a subset of the plurality of interpretations based, at least in part, on the posterior probabilities; and
performing a geosteering operation based on the updated geological model.
|