| CPC E21B 23/042 (2020.05) [E21B 17/06 (2013.01); E21B 23/0412 (2020.05)] | 20 Claims |

|
1. A method for disconnecting production tubing at a polished bore receptacle, comprising:
actuating a piston, via a control line, to travel from a first position to a second position within a polished bore receptacle within a wellbore, wherein the polished bore receptacle comprises a tubing disconnect latch system connecting first and second sections of tubing; and
shearing a set of pins to release the tubing disconnect latch system in response to the travel of the piston from the first position to the second position.
|