| CPC E21B 17/028 (2013.01) [E21B 17/046 (2013.01); E21B 47/024 (2013.01)] | 20 Claims |

|
1. A downhole completion system, comprising:
an upper completion stage comprising at least one first communication line connector;
a lower completion stage comprising at least one second communication line connector, the at least one first communication line connector configured to couple to the at least one second communication line connector; and
an orientation device configured to help determine and/or control orientation of the at least one second communication line connector relative to a well during or prior to installation, wherein the at least one first communication line connector is configured to be de-mated from the at least one second communication line connector based on an orientation of the at least one first communication line connector relative to the at least one second communication line connector.
|