13. A method of manufacturing a tower structure, the method comprising:
depositing one or more layers of an interlocking form ring with a first printhead assembly, the interlocking form ring defining a plurality of recesses in at least one of a radially inner face or a radially outer face, the first printhead assembly including, at least, a first printhead oriented in a first direction;
depositing a cementitious material within one or more of the plurality of recesses with a second printhead assembly so as to form at least one of an inner tower wall or an outer tower wall, the second printhead assembly including a second printhead oriented in a second direction, the second direction being different than the first direction;
positioning at least one reinforcing member at least partially within the recess with the second printhead assembly;
positioning an articulable forming element of the second printhead assembly adjacent to the cementitious material during curing thereof so as to provide a slip form for the curing of the cementitious material; and
simultaneously depositing the cementitious material at least partially within one or more of the plurality recesses with a third printhead assembly, the third printhead assembly being disposed radially opposite the second printhead assembly, the third printhead assembly including a third printhead oriented in the second direction.
|