CPC H04W 72/12 (2013.01) [H04W 72/23 (2023.01); H04L 1/1812 (2013.01); H04W 72/04 (2013.01); H04W 72/0446 (2013.01); H04W 72/0453 (2013.01); H04W 72/1273 (2013.01); H04W 72/20 (2023.01)] | 18 Claims |
1. A method of a base station for a communication system in which resources can be dynamically allocated at each transmission time interval on a downlink control channel, the method comprising:
transmitting control information in a case where first persistent scheduling is active,
wherein the control information includes a sequence of bits within a field,
wherein the field is configured to be used to determine a Modulation and Coding Scheme (MCS), and
wherein part of the sequence is set for activating second persistent scheduling; and
performing communication with a user equipment (UE) based on the second persistent scheduling.
|