CPC E21B 23/0413 (2020.05) [E21B 10/60 (2013.01); E21B 29/00 (2013.01); E21B 33/13 (2013.01); E21B 33/14 (2013.01); E21B 47/005 (2020.05)] | 8 Claims |
1. A method for operating a wellbore system comprising:
setting a plug in the wellbore system;
releasing the plug;
pumping cement;
dressing the cement; and
testing the cement, wherein the setting, releasing, pumping, dressing, and testing are all performed in a single run.
|