CPC G21C 3/07 (2013.01) [C23C 4/06 (2013.01); C23C 4/11 (2016.01); C23C 14/083 (2013.01); C23C 14/18 (2013.01); C23C 24/04 (2013.01); D04C 1/02 (2013.01); D04C 1/06 (2013.01); G21C 3/047 (2019.01)] | 5 Claims |
5. A nuclear fuel cladding tube comprising:
a zirconium alloy tube having a wall thickness between 100 and 1000 microns;
a structural support member comprised of a SiC braided yarn covering applied directly onto the zirconium alloy tube;
a first coating layer applied to the SiC braided yarn covering, wherein the first coating layer is made of a first material selected from the group consisting of Nb, Nb alloy, Nb oxide, and combinations thereof; and
at least one second coating layer over the first coating layer, wherein the second coating layer is made of a second material selected from the group consisting of Cr, Cr alloys, Cr oxide, and combinations thereof.
|