| CPC E21D 9/001 (2013.01) | 6 Claims |

|
1. A three-level prevention and control method for roadway rock burst, comprising:
before digging a roadway, pre-weakening a thick and hard rock stratum above the roadway using a regional staged hydraulic fracturing technology of long borehole;
during digging the roadway, performing a pre-stress support, a pressure relief, and a reinforcement; and
before stoping at working-face, transferring a stress of an advanced abutment pressure using a local hydraulic fracturing technology of medium and short borehole, and arranging a composite energy-absorbing protective structure around the roadway.
|