CPC E21C 41/16 (2013.01) [E21B 7/04 (2013.01); E21B 15/00 (2013.01)] | 17 Claims |
1. A method for erecting a drilling rig (10) for sinking boreholes on hydrocarbon deposits or for developing geothermal energy or other valuable materials or for research purposes, in a tunnel driven into a rock mass, which comprises a horizontal section functioning as a production tunnel (12) and production line, from which a vertical section extends as a mast shaft (14),
characterized by the following method steps:
erecting a mast structure (20) in the mast shaft (14) by means of an erecting structure (50) in the production tunnel (12),
wherein the mast structure (20) comprises a plurality of mast segments (60) connected to one another or connectable to one another,
wherein successive mast segments (60) are fed to the erecting structure (50) on an input side of the erecting structure (50) in a horizontal or at least substantially horizontal orientation,
wherein by means of the erecting structure (50) in each case at least one mast segment (60) on an output side of the erecting structure (50) is erected in a vertical or at least substantially vertical orientation into the mast shaft (14) or at least pointing into the mast shaft (14), and
wherein while feeding further mast segments (60) on the input side of the erecting structure (50) the or each mast segment (60) already vertically erected on the output side of the erecting structure (50) is raised into the mast shaft (14).
|