CPC H04W 52/146 (2013.01) [H04W 8/24 (2013.01); H04W 52/365 (2013.01); H04W 72/0453 (2013.01); H04W 72/0473 (2013.01)] | 20 Claims |
1. A method performed by a user equipment device (UE) for managing resource allocation, the method comprising, during a procedure to establish a connection between the UE and a base station:
receiving, by the UE from the base station, a request for capabilities of the UE, the request for capabilities indicating a set of frequency bands requested by the base station;
determining a maximum uplink (UL) duty cycle of the UE for the connection to be a lowest UL duty cycle among a set of maximum UL duty cycles of a set of candidate frequency bands, each candidate frequency band included in (i) the set of frequency bands requested by the base station, and (ii) a plurality of frequency bands supported by the UE, each UE-supported frequency band associated with a respective maximum transmission power level (MTPL);
providing, by the UE to the base station, an indication of the maximum UL duty cycle for the connection.
|