CPC H04B 7/0456 (2013.01) [H04L 27/2614 (2013.01)] | 32 Claims |
11. A method implemented in a network node, the method comprising:
determining at least one Convex Reduction of Amplitude (CRAM) projection matrix based at least in part on a signal subspace of scheduled wireless devices; and
causing transmission based at least in part on the at least one CRAM projection matrix.
|