US 11,953,577 B1
Metering component testing
Kyle Breuning Evans, Auburn, CA (US); and Sebastian Wolf, London (GB)
Assigned to Lunar Energy, Inc., Mountain View, CA (US)
Filed by Lunar Energy, Inc., Mountain View, CA (US)
Filed on Jun. 22, 2023, as Appl. No. 18/212,926.
Int. Cl. G01R 35/04 (2006.01); G01R 22/06 (2006.01)
CPC G01R 35/04 (2013.01) [G01R 22/065 (2013.01)] 20 Claims
OG exemplary drawing
 
1. A method, comprising:
obtaining a configuration associated with at least one metering component installed at a site to be metered;
performing a metering component test including at least one of:
detecting phase assignment of the at least one metering component based at least on the configuration including by:
discharging a battery by a predefined power amount on a first line;
determining whether a measurement on a first metering component changed by an expected amount;
in response to a determination that the measurement on the first metering component did not change by the expected amount:
determining that a measurement on a second metering component changed by the expected amount;
determining that the second metering component is on the first line; and
setting a phase adjustment factor for the second metering component to reflect the determination that the second metering component is on the first line;
in response to a determination that the measurement on the first metering component changed by the expected amount:
determining that the first metering component is on the first line;
setting a phase adjustment factor for the first metering component to be 1;
discharging the battery by the predefined power amount on a second line;
determining whether the measurement on the second metering component changed by the expected amount;
in response to a determination that the measurement on the second metering component did not change by the expected amount and a determination that the measurement on the first metering component changed by the expected amount:
determining that the first metering component is on the second line; and
setting a phase adjustment factor for the first metering component to reflect the determination that the first metering component is on the second line;
in response to a determination that the measurement on the second metering component changed by the expected amount:
determining that the second metering component is on the second line; and
setting a phase adjustment factor for the second metering component to be 1; and
detecting polarity of the at least one metering component based at least on the configuration; and
outputting information associated with the metering component test.