CPC F03D 7/0276 (2013.01) [F03D 9/25 (2016.05); F03D 15/20 (2016.05); H02P 9/04 (2013.01); H02P 2101/15 (2015.01)] | 16 Claims |
1. A method for controlling a wind power installation,
wherein the wind power installation includes:
a generator configured to generate electric current, wherein the generator has an air gap with a variable air gap thickness, and
wherein the method comprises:
controlling the wind power installation in a part load range using control regulation; and
selecting or setting the control regulation depending on the air gap thickness to control a tonality of the wind power installation.
|