| CPC H04W 52/365 (2013.01) [H04B 7/0426 (2013.01); H04B 7/0617 (2013.01); H04B 7/0626 (2013.01); H04B 7/0695 (2013.01); H04B 7/088 (2013.01); H04L 5/0023 (2013.01); H04L 5/0048 (2013.01); H04L 5/0051 (2013.01); H04W 16/28 (2013.01); H04W 52/08 (2013.01); H04W 52/10 (2013.01); H04W 52/146 (2013.01); H04W 52/242 (2013.01); H04W 52/248 (2013.01); H04W 52/325 (2013.01); H04W 52/362 (2013.01); H04W 52/367 (2013.01); H04W 72/046 (2013.01); H04W 72/0473 (2013.01); H04W 72/12 (2013.01); H04W 72/121 (2013.01); H04W 72/1268 (2013.01); H04W 72/23 (2023.01)] | 19 Claims |

|
1. A method at a base station, the method comprising:
transmitting a first message that configures a set of reference signal resources, each reference signal resource of the set of reference signal resources corresponding to a respective beam pattern of a set of beam patterns;
transmitting a grant for a first uplink transmission associated with a first reference signal resource of the set of reference signal resources; and
receiving the first uplink transmission using a first beam pattern of the set of beam patterns, the first uplink transmission corresponding to a first transmit power, the first transmit power is based on a first output power, the first output power is based on a first antenna array property associated with the first beam pattern, and the first beam pattern is associated with the first reference signal resource, wherein the first uplink transmission comprises a power headroom report (PHR) that indicates a first power headroom and a second power headroom, wherein the first power headroom is for the first uplink transmission and the first output power, and wherein the second power headroom includes a virtual power headroom.
|