US 12,273,361 B2
Techniques for managing projects and monitoring network-based assets
Brandon Dixon, San Francisco, CA (US); Jonas Edgeworth, San Francisco, CA (US); Stephen Ginty, Memphis, TN (US); Chris Kiernan, San Francisco, CA (US); Elias Manousos, San Francisco, CA (US); and Jonathan Matkowsky, Mercer Island, WA (US)
Assigned to Microsoft Technology Licensing, LLC, Redmond, WA (US)
Filed by Microsoft Technology Licensing, LLC, Redmond, WA (US)
Filed on Aug. 30, 2021, as Appl. No. 17/461,258.
Application 17/461,258 is a continuation of application No. 15/980,695, filed on May 15, 2018, granted, now 11,108,788, issued on Aug. 31, 2021.
Claims priority of provisional application 62/506,581, filed on May 15, 2017.
Prior Publication US 2024/0073222 A1, Feb. 29, 2024
This patent is subject to a terminal disclaimer.
Int. Cl. H04L 29/06 (2006.01); H04L 9/40 (2022.01); G06F 3/04847 (2022.01); G06T 11/20 (2006.01)
CPC H04L 63/1416 (2013.01) [H04L 63/1425 (2013.01); G06F 3/04847 (2013.01); G06T 11/206 (2013.01); G06T 2200/24 (2013.01)] 20 Claims
OG exemplary drawing
 
1. A method comprising:
accessing network data about a first network-based digital asset over a period of time from a data source by a network analysis system;
generating, at the network analysis system, a plurality of data sets associated with the first network-based digital asset based on the network data and user-generated data created by a plurality of users of the network analysis system, the plurality of data sets corresponding to a plurality of time periods in the period of time;
generating a graphical interface that displays information about the first network-based digital asset, the information based on a first data set of the plurality of data sets that corresponds to a first time period of the plurality of time periods;
generating data representing a first project associated with the first network-based digital asset;
identifying a second network-based digital asset in a second project, the second network-based digital asset related to the first network-based digital asset in the first project based on a shared attribute, the second network-based digital asset associated with a second time period that is different from the first time period; and
as a result of the second network-based digital asset being related to the first network-based digital asset based on the shared attribute and further as a result of the first time period being earlier than the second time period, causing the graphical interface to display a representation of the second network-based digital asset in the second project in association with the first time period.