| CPC H04L 12/4633 (2013.01) [H04L 45/04 (2013.01); H04L 45/16 (2013.01)] | 20 Claims |

|
1. A method comprising:
maintaining, by a first switch, a first tunnel with a second switch in an overlay tunnel fabric that includes the first and second switches, wherein encapsulation of a packet sent via the overlay tunnel fabric is initiated and terminated within the overlay tunnel fabric;
maintaining, by the first switch, a second tunnel with a third switch in an external network that excludes the first and second switches;
distinguishing the first and second tunnels as intra-fabric and inter-fabric tunnels, respectively, of the overlay tunnel fabric; and
in response to receiving a multicast control packet via the first tunnel:
identifying the second tunnel as the inter-fabric tunnel; and
forwarding the multicast control packet via the second tunnel, wherein a respective multicast control packet received from the first tunnel is precluded from being forwarded on intra-fabric tunnels of the overlay tunnel fabric.
|