| CPC G05D 13/62 (2013.01) [F16L 55/38 (2013.01)] | 17 Claims |

|
1. A method for controlling the velocity of a pipeline pig,
the method comprising, maintaining the velocity of a smart pipeline pig at a predetermined velocity by regulating a pressurized gas to a predetermined volume, further comprising:
fluidically connecting a first skid to a first end of a section of pipeline to be treated, and
fluidically connecting a second skid to a second end of the section of pipe to be treated,
the first skid comprising a first temperature sensor, a first pressure sensor, a first differential pressure sensor, a first flow control valve, and a first flow computer, and the second skid comprising a second temperature sensor, a second pressure sensor, a second differential pressure sensor, a second flow control valve, and a second flow computer.
|