| CPC E04C 5/0645 (2013.01) [E04B 5/32 (2013.01); E04B 2005/324 (2013.01); E04B 2103/02 (2013.01)] | 13 Claims |

|
1. A method of laying one or more concrete topping slabs over an existing concrete structure, the method comprising:
providing a concrete form defining an area on a surface of the concrete structure;
drilling a plurality of holes into the surface of the concrete structure within the area;
attaching a slip-dowel receiving sheath to the concrete form, the slip-dowel receiving sheath extending parallel to the surface of the concrete structure along an axis;
inserting a plurality of bent metal bars into respective ones of the plurality of holes such that a first end portion of each bent metal bar is received in the respective one of the plurality of holes and a second end portion of each bent metal bar extends in a common direction parallel to the axis; and
pouring a concrete mixture over the surface of the concrete structure and about the slip-dowel receiving sheath and the second end portions of the plurality of bent metal bars.
|