| CPC C09K 8/487 (2013.01) [C04B 14/06 (2013.01); C04B 24/24 (2013.01); C04B 2103/20 (2013.01); C04B 2103/44 (2013.01); C04B 2103/46 (2013.01); C04B 2201/50 (2013.01)] | 14 Claims |

|
1. A method comprising:
providing a cement structure in a wellbore, wherein the cement structure comprises: a cement and elastomer particles at 1% by weight of the cement (bwoc) to 25% bwoc;
applying heat to the cement structure to heat at least a portion of the elastomer particles above a melting point of an elastomer of the elastomer particles to cause at least a portion of the elastomer to melt and infiltrate into a defect in the cement structure; and
allowing the elastomer to cool below the melting point of the elastomer to yield a repaired cement structure.
|