CPC H04W 72/569 (2023.01) | 12 Claims |
1. An information transmission method performed by a terminal, comprising:
receiving priority indication information sent through a Radio Resource Control (RRC) signaling or a Downlink Control Information (DCI) indication signaling or a Medium Access Control (MAC) control element by a network device;
instructing a physical layer to send a target Scheduling Request (SR) on a target Physical Uplink Control Channel (PUCCH) resource according to the priority indication information;
wherein the priority indication information comprises first information and second information,
the first information is logical channel priority information, the logical channel priority information is configured for indicating a priority of logical channel multiplexing, the second information is configured for indicating a priority of SR configuration, the priority of SR configuration is determined to be lower than a priority of Uplink Scheduling Channel (UL-SCH) transmission by comparing a priority of logical channel multiplexing with the priority of SR configuration;
wherein, instructing the physical layer to send the target SR on the target PUCCH resource according to the priority indication information comprises:
in a case that a first PUCCH resource in SR configuration corresponding to a pending SR overlaps with an UL-SCH transmission resource, instructing the physical layer to transmit the SR on the first PUCCH resource, if a priority of a target object is determined to be higher than the priority of UL-SCH transmission according to the priority indication information; or
in a case that a second PUCCH resource in SR configuration corresponding to a pending SR overlaps with an UL-SCH transmission resource, instructing the physical layer to transmit the SR on a next available third PUCCH resource adjacent to the second PUCCH resource, if the priority of SR configuration is determined to be lower than the priority of UL-SCH transmission according to the priority indication information; or
in a case that a third PUCCH resource in SR configuration corresponding to a pending SR overlaps with an UL-SCH transmission resource, instructing the terminal to transmit the UL-SCH on the UL-SCH transmission resource, if the priority of SR configuration is determined to be lower than the priority of UL-SCH transmission according to the priority indication information.
|