| CPC H02J 3/003 (2020.01) [F24D 3/00 (2013.01); F25B 27/02 (2013.01); H02J 3/144 (2020.01); H02J 3/466 (2020.01)] | 19 Claims |

|
1. A system, comprising:
a first subsystem configured to produce a resource by consuming electricity;
a second subsystem configured to produce the resource by consuming a fuel; and
a controller configured to:
determine an allocation of a predicted demand for the resource over a future time period between the first subsystem and the second subsystem based on a first carbon emissions rate associated with off-site production of the electricity and a second carbon emissions rate associated with on-site consumption of the fuel; and
control the first subsystem and the second subsystem to produce the resource in accordance with the allocation during the future time period.
|