| CPC E02D 27/525 (2013.01) [E02D 5/30 (2013.01); E02D 5/40 (2013.01); E02D 5/523 (2013.01); E01D 19/02 (2013.01); E02D 2200/1685 (2013.01); E02D 2300/002 (2013.01); E02D 2300/0029 (2013.01); E02D 2300/0045 (2013.01); E02D 2300/0051 (2013.01)] | 31 Claims |

|
1. A support structure, comprising:
first and second expanded metal structural pillars positioned within the ground by a distance (d1), the first and second expanded metal structural pillars comprising a metal that has expanded in response to hydrolysis; and
one or more beams spanning the first and second expanded metal structural pillars.
|