US 12,257,737 B2
Ecological slope anti-corrosion timber pile, and treatment device and treatment method therefor
Hanxi Wang, Harbin (CN); Shuying Zang, Harbin (CN); and Hongjun Zhang, Harbin (CN)
Assigned to Harbin Normal University, Harbin (CN)
Filed by Harbin Normal University, Harbin (CN)
Filed on Oct. 1, 2024, as Appl. No. 18/903,079.
Application 18/903,079 is a continuation of application No. PCT/CN2023/119299, filed on Sep. 18, 2023.
Claims priority of application No. 202211385602.4 (CN), filed on Nov. 7, 2022.
Prior Publication US 2025/0018596 A1, Jan. 16, 2025
Int. Cl. B27K 5/00 (2006.01); C10B 53/02 (2006.01); F23G 5/027 (2006.01); F23G 5/38 (2006.01)
CPC B27K 5/0085 (2013.01) [C10B 53/02 (2013.01); F23G 5/0276 (2013.01); F23G 5/38 (2013.01); F23G 2201/303 (2013.01); F23G 2206/10 (2013.01); F23G 2209/261 (2013.01)] 18 Claims
OG exemplary drawing
 
1. A treatment device, comprising
a gasification furnace, and
three carbonization chambers (a first carbonization chamber, a second carbonization chamber and a third carbonization chamber);
wherein each of the first carbonization chamber, the second carbonization chamber and the third carbonization chamber comprises:
a main gas pipeline in an interior thereof,
branch gas pipes disposed on the main gas pipeline along a vertical direction, and the branch gas pipes comprising-electronic igniters,
wherein each of the first carbonization chamber, the second carbonization chamber and the third carbonization chamber is configured to receive timber piles in the interior along a vertical direction between the branch gas pipes;
wherein the gasification furnace is connected to the main gas pipeline of the first carbonization chamber by a gas booster pump; the first carbonization chamber is connected to an air blower; the first carbonization chamber is connected to the second carbonization chamber by a joint pipe; the second carbonization chamber is connected to the third carbonization chamber by a pipeline; and the third carbonization chamber is connected to the gasification furnace by a gas delivery pipe;
wherein the third carbonization chamber is configured to dry the timber piles, the second carbonization chamber is configured to thermally bake the timber piles, and the first carbonization chamber is configured to burn and carbonize the timber piles.