CPC G06F 11/3058 (2013.01) [G06F 2209/5022 (2013.01)] | 20 Claims |
1. A processing system concurrency optimization system, comprising:
a processing system including:
a first processing subsystem; and
a second processing subsystem;
a power system that is coupled to the first processing subsystem and the second processing subsystem;
a processing system concurrency optimization database; and
a processing system concurrency optimization subsystem that is coupled to the power system and the processing system concurrency optimization database, wherein the processing system concurrency optimization subsystem is configured to:
determine that a first workload has been provided for performance by the processing system;
identify a first processing system concurrency optimization profile that is associated with the first workload in the processing system concurrency optimization database; and
configure, based on the first processing system concurrency optimization profile, the power system to provide first power to the first processing subsystem in a first power range that is defined by a first processing subsystem average power setting and a first processing subsystem peak power setting of the first processing subsystem, and provide second power to the second processing subsystem in a second power range that is defined by a second processing subsystem average power setting and a second processing subsystem peak power setting of the second processing subsystem.
|