CPC G01N 33/24 (2013.01) [E21B 33/1243 (2013.01); E21B 33/127 (2013.01); E21B 47/003 (2020.05); E21B 47/06 (2013.01); E21B 49/00 (2013.01); E21B 49/006 (2013.01); G01N 19/00 (2013.01)] | 17 Claims |
1. A method, comprising:
assembling a logging tool for measuring a pressure within a portion of a wellbore, wherein the logging tool comprises one or more sensors and one or more packers;
positioning the logging tool into the portion of the wellbore, wherein the one or more packers are positioned in a section of a geological formation associated with the portion of the wellbore;
purging air from the logging tool; and
performing a pressure meter test on the section of the geological formation, wherein the pressure meter test comprises:
performing a series of inflation and deflation cycles within the section of the geological formation; and
receiving a plurality of pressure and volume measurements associated with the section of the geological formation from the one or more sensors during the series of inflation and deflation cycles.
|