CPC E04F 21/22 (2013.01) | 11 Claims |
1. A method for using a tile leveling device the method comprising:
placing at least one tile leveling device beneath a tile to be laid;
wherein the at least one tile leveling device is comprised of a material which may be reshaped using reasonable force;
placing a tile on top of the at least one tile leveling device;
leveling the tile,
wherein the tile leveling device is left under the tile.
|