CPC C09K 8/467 (2013.01) [C04B 22/00 (2013.01); C04B 28/02 (2013.01); C04B 28/04 (2013.01); C04B 28/18 (2013.01); C04B 28/34 (2013.01); E21B 33/138 (2013.01); C04B 2103/0036 (2013.01); C04B 2103/10 (2013.01); C04B 2103/12 (2013.01); C04B 2103/20 (2013.01); E21B 33/16 (2013.01); E21B 36/003 (2013.01); E21B 41/02 (2013.01); E21B 43/14 (2013.01); Y02P 40/10 (2015.11)] | 20 Claims |
1. A method of cementing comprising:
providing a liquid additive comprising a passivated cement accelerator, the passivated cement accelerator comprising particles of a cementitious material and, comprising a passivating layer said passivating layer comprising of a hydration reaction product formed by adding the particles to water that encapsulates the particles of the cementitious material, the passivated cement accelerator being prepared by a process comprising storing the liquid additive in a pumpable fluid state for at least one day;
after storing the liquid additive in a pumpable fluid state for at least one day, combining the liquid additive comprising the passivated cement accelerator with at least a cement and water to prepare a cement composition, wherein the passivated cement accelerator includes the passivating layer when combined with the water, and wherein the passivating layer at least partially dissolves in an alkaline environment formed by the water and the cement;
introducing the cement composition into a subterranean formation; and
allowing the cement composition to set.
|