| CPC H04B 7/18504 (2013.01) [H04B 7/0408 (2013.01); H04B 7/0417 (2013.01); H04B 7/0695 (2013.01); H04B 7/18506 (2013.01); H04B 7/18515 (2013.01); H04B 7/2041 (2013.01); H04L 5/14 (2013.01); H04L 12/2854 (2013.01); H04L 12/4625 (2013.01); H04W 4/06 (2013.01); H04W 16/24 (2013.01); H04W 36/304 (2023.05); H04W 48/16 (2013.01); H04W 84/06 (2013.01)] | 35 Claims |

|
1. A method comprising:
creating a wireless link between a computing device and an air-based communication node of a plurality of air-based communication nodes;
providing, using the air-based communication node, a first time division duplex (TDD) link at a first frequency or band and a second TDD link at a second frequency or band, each of the TDD links having an uplink portion and a downlink portion; and
communicating, using the air-based communication node, such that there is an overlap between a portion of the downlink portion of the first TDD link and a portion of the uplink portion of the second TDD link, wherein a communication latency is based at least in part on the overlap.
|