| CPC E21B 44/00 (2013.01) | 17 Claims |

|
1. A method implemented at a downhole drilling system, comprising:
receiving surface contextual data of the downhole drilling system, wherein the surface contextual data is representative of surface conditions, operation of surface equipment, or both, at first respective measurement times during a drilling operation;
receiving downhole contextual data of the downhole drilling system, the downhole contextual data including downhole operating data for a downhole tool at second respective measurement times during the drilling operation;
merging the downhole contextual data with the surface contextual data based on the first respective measurement times and the second respective measurement times, such that the surface contextual data and the downhole contextual data are synchronized by using a common time, to generate the merging of the downhole contextual data with the surface contextual data;
preparing a historical comparison between historical data and the merging of the downhole contextual data with the surface contextual data; and
based on the historical comparison, generating a tool health status of the downhole tool.
|