| CPC E02D 27/525 (2013.01) [F16L 1/16 (2013.01)] | 31 Claims |

|
1. A subsea foundation, comprising:
at least one mudmat having a top panel and a skirt depending from the top panel to be embedded into seabed soil; and
at least one auxiliary plate supported by the mudmat, the plate being deployable downwardly from a raised, retracted position in which the plate is held above a lower edge of the skirt into a lowered, deployed position in which the plate extends beneath the lower edge of the skirt to be embedded further into the seabed soil.
|