US 11,930,550 B2
Equipment for beam failure reporting and beam failure reporting method
Li-Chung Lo, New Taipei (TW); and Chien-Min Lee, New Taipei (TW)
Assigned to ACER INCORPORATED, New Taipei (TW)
Filed by Acer Incorporated, New Taipei (TW)
Filed on Jul. 9, 2021, as Appl. No. 17/371,246.
Claims priority of provisional application 63/061,199, filed on Aug. 5, 2020.
Prior Publication US 2022/0046740 A1, Feb. 10, 2022
Int. Cl. H04W 24/04 (2009.01); H04L 5/00 (2006.01); H04W 24/10 (2009.01); H04W 72/21 (2023.01); H04W 76/19 (2018.01)
CPC H04W 76/19 (2018.02) [H04L 5/0092 (2013.01); H04W 24/04 (2013.01); H04W 24/10 (2013.01); H04W 72/21 (2023.01)] 26 Claims
OG exemplary drawing
 
1. A user equipment (UE) for beam failure reporting, comprising:
a radio frequency (RF) signal processing device, receiving a first candidate-beam reference-signal (RS) list and a second candidate-beam RS list, and reporting a beam failure information associated with the first candidate-beam RS list and/or the second candidate-beam RS list,
wherein the first candidate-beam RS list is associated with a first beam-failure-detection RS (BFD-RS) set and the second candidate-beam RS list is associated with a second BFD-RS set,
wherein the beam failure information comprises at least one of following: at least on component carrier (CC) index, at least one new candidate beam, an identity (ID) of BFD-RS set, or an CORESETPoolIndex,
wherein the RF signal processing device is provided a first scheduling request ID of beam failure recovery (BFR) for a first physical uplink control channel (PUCCH) resource and a second scheduling request ID of BFR for a second PUCCH resource, wherein the first scheduling request ID is associated with the first BFD-RS set and the second scheduling request ID is associated with the second BFD-RS set,
wherein the RF signal processing device transmits the first PUCCH resource associated with the first scheduling request ID of BFR when a beam failure associated with the first BFD-RS set is detected and a beam failure associated with the second BFD-RS set is not detected,
wherein the RF signal processing device transmits the second PUCCH resource associated with the second scheduling request ID of BFR when the beam failure associated with the second BFD-RS set is detected and the beam failure associated with the first BFD-RS set is not detected.