CPC G05B 13/0265 (2013.01) [G05B 15/02 (2013.01); G06N 5/022 (2013.01); G06N 5/04 (2013.01); G06N 20/10 (2019.01); G16Y 10/80 (2020.01); H04L 12/2803 (2013.01); H04L 12/2821 (2013.01); H04L 12/2827 (2013.01); H04L 41/0645 (2013.01); H04L 67/12 (2013.01)] | 20 Claims |
1. A building system comprising:
one or more memory devices configured to store instructions that, when executed on one or more processors, cause the one or more processors to:
collect building device data of a building device, the building device data comprising a plurality of data samples of a data point;
generate a time correlated data stream for the data point, the time correlated data stream comprising values of the plurality of data samples of the data point;
generate a time correlated reliability data stream for the data point, the time correlated reliability data stream comprising a plurality of reliability values time correlated to corresponding values of the plurality of data samples of the data point and indicating reliability of the values of the plurality of data samples of the data point; and
perform one or more operations comprising at least one of operating building equipment based on the time correlated data stream or the time correlated reliability data stream for the data point or deriving an insight from the time correlated data stream or the time correlated reliability data stream for the data point.
|