| CPC E21B 41/00 (2013.01) [E21B 35/00 (2013.01); E21B 43/121 (2013.01); E21B 47/06 (2013.01)] | 20 Claims |

|
1. A method for preventing flaring at a facility, comprising:
receiving a plurality of pressure measurements from a sensor;
determining that at least one of the plurality of pressure measurements is greater than a threshold pressure, wherein the threshold pressure corresponds to mitigating a flaring event;
analyzing injection response curves for a plurality of wells to determine a first well for adjusting a back pressure on a reservoir intersected by the first well; and
transmitting an instruction for adjusting the back pressure on the reservoir.
|