| CPC B63B 35/44 (2013.01) [B63B 1/12 (2013.01); B63B 25/14 (2013.01); F17C 6/00 (2013.01); B63B 2035/4433 (2013.01); B63B 2035/4473 (2013.01); B63B 2035/4486 (2013.01); F17C 2221/033 (2013.01); F17C 2227/0157 (2013.01); F17C 2265/032 (2013.01); F17C 2270/0121 (2013.01); F25J 1/0022 (2013.01)] | 20 Claims |

|
1. A process plant comprising:
a first plant module including a power generation module on a first vessel, the first vessel comprising a first mobile jack-up vessel;
a second plant module including a gas treatment facility on a second vessel, the second vessel comprising a second mobile jack-up vessel; and
a third plant module including a gas liquefaction facility on a third vessel, the third vessel comprising a third mobile jack-up vessel;
wherein:
the second vessel is configured to couple to the first vessel such that the second plant module receives electricity from the power generation facility; and
the third vessel is configured to couple to the second vessel such that the third plant module receives electricity from the power generation facility.
|