CPC E21B 43/166 (2013.01) [E21B 43/003 (2013.01); E21B 47/00 (2013.01)] | 20 Claims |
1. A method, comprising:
providing an injection well extending from a surface into a formation; and
alternatingly pumping a foam injectant and a gel injectant into the injection well;
wherein the foam injectant comprises:
a liquid phase comprising a surfactant and water; and
a gas phase comprising a gas;
wherein the gel injectant comprises a water-soluble polymer and a crosslinker; and
wherein the foam injectant and the gel injectant are injected at separate times and sequentially; and
using the injected gel injectant and the injected foam injectant to drive a reservoir fluid in the formation to a production well a distance from the injection well.
|