CPC E21B 41/0085 (2013.01) [F03G 3/094 (2021.08); H02J 15/00 (2013.01); E21B 47/04 (2013.01); Y10T 137/5983 (2015.04)] | 19 Claims |
1. A method for retrofitting a well, comprising:
installing a potential energy conversion system into an interval of a non-producing well having a wellhead located at the earth's surface, the potential energy conversion system comprising a movable mass suspended by a line in the non-producing well, and the line being coupled to a motor operable to lift the movable mass and a generator operable to produce electricity when lowering the movable mass within the interval;
introducing a fluid into the interval of the non-producing well;
wherein the fluid comprises an additive, and the additive is selected to minimize corrosion, modify rheological properties, reduce friction, convey biocidal activity, or inhibit scale; and
capping the non-producing well after installing the potential energy conversion system therein.
|