| CPC H04B 7/18532 (2013.01) [H04B 7/01 (2013.01); H04B 7/18508 (2013.01); H04B 7/18543 (2013.01); H04B 7/2125 (2013.01); H04W 84/06 (2013.01)] | 20 Claims | 

| 
               1. A method for reconfiguring one or more communication channels of a communication channel allocation scheme of a multiple-access base station, wherein the communication channels are for transmitting one or more signals, wherein the one or more signals are transmitted between the multiple-access base station and terrestrial mobile stations of a plurality of terrestrial mobile stations, the multiple-access base station having one or more transceiver that handles communication with the plurality of terrestrial mobile stations, and wherein the one or more signals are affected by a delay due to an orbital path of the communication channels and/or affected by a Doppler shift due to a motion of an orbital component of the communication channels, the method comprising: 
            (a) reconfiguring the one or more communication channels of the communication channel allocation scheme into reconfigured communication channels, based at least on the delay and/or the Doppler shift; 
                (b) reconfiguring a transceiver associated with the one or more communication channels of the communication channel allocation scheme by altering a timeslot synchronization offset associated with a signal transmission timeslot; 
                (c) updating a configured frequency offset for receiving and transmitting signals of the transceiver associated with the one or more communication channels of the communication channel allocation scheme; and 
                (d) remapping the reconfigured communication channels in the communication channel allocation scheme. 
               |