| CPC G06F 1/3296 (2013.01) | 15 Claims |

|
1. A device, comprising:
a first payload in communication with a rack configured to output voltage to the first payload, the first payload including one or more processors configured to:
detect a power throttling signal transmitted by the rack; and
delay, based on the power throttling signal, throttling power consumption of the first payload by a period of time, wherein a duration of the delay corresponds to at least one of:
an amount of time for all other payloads in the rack to detect the power throttling signal, or
an amount of time for all other payloads in the rack to acknowledge receipt of a power throttling signal.
|