| CPC F16L 1/028 (2013.01) [F16L 1/06 (2013.01); F16L 3/14 (2013.01); H02G 1/06 (2013.01)] | 30 Claims |

|
14. A method of isolating under-slab utilities and under-slab portions of hanger assemblies from a subgrade under a slab of a slab-on-voidform foundation, wherein said utilities are installed before concrete of said slab is poured, comprising tie following steps:
A. First:
i) installing one or more temporary support apparatuses that are supported by a subgrade and configured to support one or more hanger assemblies;
ii) wherein said one or more hanger assemblies are configured to suspend one or more segments of a utility; and
wherein said one or more hanger assemblies and said one or more segments of of a utility are not in contact with a subgrade;
iii) installing void forms over a subgrade wherein said voidforms are configured to not be supported by said one or more segments of a utility;
iv) transferring support of said one or more banger assemblies from said one or more temporary support apparatuses to said voidforms; and
B. Second, pouring the concrete of the slab of the slab-on-voidform foundation over said one or more segments of a utility.
|